CHANGED TRAFFIC CONDITIONS – WIDE LOAD – A Giant 477 tonne transformer for the Waratah Super Battery is being transported over two nights on the M1 Pacific Motorway. Tonight’s leg of the trip will begin at Campbelltown with a top speed of 40km/h and will travel to Mooney Mooney in a vehicle configuration of up to 5.8m wide and 125m in length between 11pm and 5am. The load with park up on the M1 until 11pm Sunday where it will travel to is final location near Lake Munmorah.

WATCH VIDEO: https://www.facebook.com/m1trafficnsw/videos/1305326560136887/

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn